The Municipality of Bohinj has adopted a temporary navigation regime on the Sava Bohinjka for the purpose of a proper exit from the Sava Bohinjka River. Namely, at the entry/exit points from Bohinjska Bistrica onwards, the construction of the Bled – Bohinj cycle path is taking place on the road branches to the entry/exit points, or the access is a construction connection, which is why it was necessary to close the entry/exit points of Bitnje, Soteska double bridge and the power plant for the 2023 season.
For the 2023 season, the last entry/exit point is on the Sava Bohinjka in Bohinjska Bistrica near the road bridge (behind the Petrol gas station). Here you can find the official municipal decree (in Slovene language). Thank you for your understanding.